Tailings Distribution

Tailings Distribution, West Coast Tasmania
Large mine on the West Coast of Tasmania engaged Irrigation Tasmania to change tailings discharge from single point to multiple point discharge, to distribute the tailings more evenly around their tailings dam.

Four 315mm poly pipe lines from the pump station were brought to a custom built distribution and control manifold, where pumps and lines could be distributed to different parts of the dam. Manifold was constructed from 630mm poly pipe with 8,300mm valved off takes. Tailings were then distributed in sections with 100mm discharge pipes.

This enabled the mine to place tailings around the dam edge, and monitor and control tailings placement.

 
Industrial Dust Suppression

Irrigation Tasmania has onongoing project to design and install dust suppression around a mine's processing plant. Project involves the design and installation of dust suppression around the plant roadways and loading areas. Operators can individually select areas to be watered, depending on the direction and strength of the wind and the amount of dust being created.





Service

"The most sophisticated and functional equipment demands the best quality service.

This starts when your requirements are assessed and continues long after your system is up and running.

At Irrigation Tasmania we know our service is simply the best, and we have an ongoing commitment to keep it that way."
 


HOME | ABOUT US | PRODUCTS | SERVICES | CENTRE PIVOT/LINEAR MOVE | K-LINE Copyright © 2003 Irrigation Tasmania Pty Ltd
Site by Murchison Software